Model the KPI impact as equations
Built for when a specific KPI number has to survive scrutiny — build the explicit arithmetic model of a feature's impact on named KPIs, every term a sourced or flagged assumption, with sensitivity ranges on the shaky ones.
- Category
- Metrics & Measurement
- Skill file
- 45 lines
- Preview shown
- First 9 lines
- Included in
- AI PM OS ($99)
When to use Impact Model
- 01When a Metrics & Measurement task needs repeatable structure instead of an ad-hoc chat prompt.
- 02When you want guided output covering Step 1 — Get the feature and the KPIs on trial and Step 2 — Write the equation for each KPI.
Example input and output
Example prompt
/pm-os:impact-model Apply this to the active product brief in this workspace.
Sample output excerpt
The doc holds: the KPIs and definitions, each equation, the term table with source tags, the point estimates with arithmetic and sanity checks, and the sensitivity ranges with the highest-leverage assumption.Inside the skill file (preview)
Showing the opening 9 lines of 45. The full instruction sequence, rubrics, and guardrails ship inside AI PM OS.
## Step 1 — Get the feature and the KPIs on trial
Ask for the feature and the specific KPIs someone wants estimated. Each KPI is a separate model; don't add KPIs nobody asked about.
Done when the feature is stated and each KPI is named with its current definition (what counts, over what window).
## Step 2 — Write the equation for each KPI
Express each KPI's change as an explicit formula — e.g. Δretention = (users reaching the feature) × (adoption rate) × (retention lift among adopters) ÷ (total users). Every term must be something that can be looked up, estimated, or argued about on its own.Not ready for $99 yet?
Test 3 free Claude Code PM plugins first
I'll email the free plugin library link so you can try my PM craft skills on your computer before deciding.
Sent straight to your inbox. No newsletter signup.
When to reach for a sibling skill instead
- Size the opportunity with a funnel/pm-os:impact-sizing
A first rough is-it-worth-building estimate
- Define the success metric for a change/pm-os:success-metric
Defining the success metric
- Design the minimum experiment that could disprove the hypothesis/pm-os:experiment-design
Designing the test that validates the assumptions